YRC Freight's Baltimore yard had an overflow area that was used for trailer parking; however, the area was sinking and rutting due to the weight of the trailers. The area eventually became so severely rutted that it was unusable. Ruston Paving was originally contacted by YRC to perform full depth stone and subgrade replacement to address the reoccurring problem. It was then that we suggested the soil stabilization process as an alternative method. The process mitigated costs and drastically shortened the construction schedule. In addition to saving time and money, this process ultimately provided a more structurally sound finished product. This project marks the third project in as many years that Ruston Paving has completed for YRC and we are proud to call them a repeat customer!