Electri-Products Group – Greensboro, NC

Reclaming at EPGPaving at EPG Electri-Products Group (EPG), had an old parking lot that was severely cracked and in desperate need of repair.  We suggested several options ranging from traditional "remove and replace" methods to an environmentally conscious process, known as full depth reclamation (FDR) with Portland cement.  The FDR process reuses and improves the engineering properties the existing material on-site.  EPG opted for this full depth recycling option, which also was the most cost effective choice.  Ruston Paving worked around EPG's schedule and was able to reclaim and stabilize the parking lot on a Friday/Saturday and then returned to pave two lifts of hot mix asphalt on a subsequent Saturday.  