During construction of the Peak Rehabilitation Center, lime stabilization played a crucial role in enhancing soil strength and stability. Ruston Paving’s process involves carefully applying lime to optimize the soil's properties, ensuring a solid foundation for the new facility. Engineering assessments and precise application techniques were employed to achieve the desired compaction and strength without compromising adjacent structures or environmental concerns. The lime stabilization at Peak Rehabilitation Center exemplified a proactive approach to construction, prioritizing long-term durability and safety.