Mick Lougee is pictured operating a freshly painted milling machine out at Glenwood Plaza. Mick was removing 4" of cracked and broken asphalt, which was then replaced with 2½” of binder and 1½” of top. In addition to the 7,300 SF of mill and replace work that was completed, our crews needed two 10-wheeler loads of hot mix asphalt to fill all the potholes Ol' Man Winter created.