Village Green Apartments – Baldwinsville, New York

Ruston Paving was contracted by Dawn Homes, the owners of Village Green Apartments, to mill off 4″ of the existing pavement and install a new surface course of asphalt at one of the complex’s parking lots. However, once the existing material was removed, it was apparent that the subbase was too soft, which was the...

Owego-Apalachin Schools – Owego, New York

In 2011, flooding from Tropical Storm Lee caused significant damage to the Owego-Apalachin School District. Consequently, FEMA announced the approval of $23 million in funding to relocate its schools to a less flood-prone area and construct the administrative, maintenance, and storage buildings that were badly damaged. One of the final steps was to reconstruct the...

bioMérieux – Durham, North Carolina

As bioMérieux, a world leader in the field of in vitro diagnostics, continues to expand its US headquarters in Durham, Ruston Paving is proud to once again work onsite. After removing the topsoil, our crews stabilized the area for a new parking lot by using the process of soil stabilization. An asphalt pavement layer was then...

Kennametal – Asheboro, North Carolina

Ruston Paving was contacted by Kennemetal to reconstruct its aging parking lot. Over the years, the pavement structure had failed and there were serious drainage issues that needed to be addressed. After listening to the engineering manager on site, we suggested the full depth reclamation process. This process would provide a strong subbase and allow us...

Fort Lee Baptist Church – Richmond, Virginia

Ruston Paving was contacted directly by the Fort Lee Baptist Church, near the Richmond Airport, to reconstruct its parking lot.  A church representative gave us numerous compliments on the crews’ professionalism, work ethic, and safety measures.  He made a point to say that both our foremen took the time to answer his questions in the field...

Another Successful FDR Project

A large consumer goods manufacturer in the Richmond area had plans to remove and replace some failing areas of a large parking lot. During conversations with the project’s general contractor about the scope of work, we suggested a full depth reclamation (FDR) option that would save the company both time and money while still maintaining...

United Rentals – Herndon, Virginia

The aerial yard at United Rentals’ Herndon facility needed to be reconstructed and repaved. Because this lot acts as a main hub for all their Northern Virginia aerial lift equipment, hitting the project deadline was paramount. A portion of the lot was reconstructed in-place by using our full depth reclamation process while the rest of the area received...

Deep River Office Park – Greensboro, North Carolina

Childress Klein, one of the largest real estate firms in the Southeast, contracted Ruston Paving to remove the old pavement at their Deep River Office Park property  and install a new surface course. Once our crews assembled on-site and the existing pavement was removed, we found that the subbase lacked the proper strength and should also be...

Saddle Club Townhomes – Liverpool, New York

Ruston Paving was certainly up to the challenge when Saddle Club Townhomes decided to reconstruct 8 of its 17 parking areas. The residents were very understanding as they were asked to park in alternate areas while our crews pulverized, stabilized and paved their lots. Initially, the repair process of asphalt milling and paving was considered by the owner, Dawn...

The Peggs Company – Ashland, Virginia

Ruston Paving was contacted by The Peggs Company to come up with a way to pave their old, pothole-ravaged, stone yard.  The Pegg’s Company warehouse assembles mass quantities of new shopping carts along with reconditioning older carts.  This yard is used for staging supplies and shipping/receiving 18-wheeler deliveries.  After regrading the site to achieve positive drainage,...