Alexander Industrial Park

Alexander Industrial Park – Durham, NC

Alexander IP (soil stabilization)Ruston Paving was approached by BC Construction Group (BCCG) to help them dry and stabilize some wet, marginal soils on which Alexander Industrial Park was being built. BCCG tried to dry the construction area by traditional means but could not make any progress do to the wet winter weather. Our soil stabilization process, which incorporated a precise quantity of Portland cement, dried the site to the optimal moisture content and allowed construction to continue.
  • In order to notify the correct Division, please enter the location where the work is to be performed.