New York

Glenwood Plaza – Oneida, NY

Mick Lougee is pictured operating a freshly painted milling machine out at Glenwood Plaza. Mick was removing 4″ of cracked and broken asphalt, which was then replaced with 2½” of binder and 1½” of top. In addition to the 7,300 SF of mill and replace work that was completed, our crews needed two 10-wheeler loads...

St. Patrick’s Day Parade – Syracuse, NY

We had a great turn out for this year’s parade, even with a less than desirable weather forecast.  We would like to give special thanks to the guys that helped clean and polish the equipment before the parade: Jeremy Coulter, Tony Gyder and RJ Haley.  A “thank you” goes out to our drivers: James Ribble in...

Gateway Building – Syracuse, NY

Mark Piraino’s crew is pictured paving Forestry Drive between SUNY College of Environmental Science and Forestry (alma mater of Tom Nelson and Matt Stokes) and the Carrier Dome (home to the Syracuse University Orangemen, the 2003 NCAA Men’s Basketball National Champs). The project commenced at 5am with milling and grading, followed by paving of one...

Paychex – Webster, NY

We are excited to be working on another Paychex project with The Pike Company – this time in Webster, NY.  The project consists of approximately 90,000 SF of full depth reconstruction and 133,000 SF of 1.5″ mill, installation of petromat and a hot mix asphalt overlay.  Pictured here is Blaine Graham’s excavation crew getting the loading...