Full Depth Reclamation

Another Successful FDR Project

A large consumer goods manufacturer in the Richmond area had plans to remove and replace some failing areas of a large parking lot. During conversations with the project’s general contractor about the scope of work, we suggested a full depth reclamation (FDR) option that would save the company both time and money while still maintaining...

United Rentals – Herndon, Virginia

The aerial yard at United Rentals’ Herndon facility needed to be reconstructed and repaved. Because this lot acts as a main hub for all their Northern Virginia aerial lift equipment, hitting the project deadline was paramount. A portion of the lot was reconstructed in-place by using our full depth reclamation process while the rest of the area received...

Deep River Office Park – Greensboro, North Carolina

Childress Klein, one of the largest real estate firms in the Southeast, contracted Ruston Paving to remove the old pavement at their Deep River Office Park property  and install a new surface course. Once our crews assembled on-site and the existing pavement was removed, we found that the subbase lacked the proper strength and should also be...

Saddle Club Townhomes – Liverpool, New York

Ruston Paving was certainly up to the challenge when Saddle Club Townhomes decided to reconstruct 8 of its 17 parking areas. The residents were very understanding as they were asked to park in alternate areas while our crews pulverized, stabilized and paved their lots. Initially, the repair process of asphalt milling and paving was considered by the owner, Dawn...

The Peggs Company – Ashland, Virginia

Ruston Paving was contacted by The Peggs Company to come up with a way to pave their old, pothole-ravaged, stone yard.  The Pegg’s Company warehouse assembles mass quantities of new shopping carts along with reconditioning older carts.  This yard is used for staging supplies and shipping/receiving 18-wheeler deliveries.  After regrading the site to achieve positive drainage,...

Keswick Club – Charlottesville, Virginia

The newly paved road at Keswick Estates overlooking the historic Keswick Hall and their renowned golf course is truly breathtaking.  This project consisted of FDR for this entire road with patching and overlay throughout the rest of the neighborhood.  The crews worked relentlessly to keep the job site safe and clean while paying attention to detail...

The Image Press – Cicero, New York

Ruston Paving’s Syracuse crews, with help from some key Rochester employees, did a fantastic job reconstructing this distressed parking lot for Image Press, a nationally recognized digital printing company. The entire property is located in a very wet area in the Town of Cicero; however, by utilizing a full depth reclamation process with Portland cement,...

Home Comfort – Scottsville, New York

Home Comfort is planning to move their office from Jefferson Road to a location in Scottsville. Before they could move in, Home Comfort wanted Ruston Paving to reconstruct the existing parking lot. By using our full depth reclamation process, our Rochester crews were able to pulverize everything on-site and reconstruct a solid base on which to...

Garret Farms Tennis Courts – Durham, North Carolina

Garrett Farms, a large subdivision in Durham County, had two tennis courts that were in dire need of repair due to root and water damage. Ruston Paving was contracted by North State Resurfacing, the general contractor of the project, to pulverize the existing courts and a portion of the subbase. We then mixed Portland cement into the...

Days Inn – Durham, North Carolina

After completing interior renovations, the Days Inn of Durham was ready to fix their 20+ year old parking lot.  Pictured is a crew from Ruston Paving’s Durham division that is completing the process of full depth reclamation (FDR) on the failing lot.  The FDR process allowed us to repair the entire pavement section and correct the drainage...