Repairs

Fair City Mall – Fairfax, VA

Ruston Paving was contacted by RM Bradley last year to reconstruct numerous crosswalks to meet ADA approval.  Recognized as one of the Northeast’s premier firms, RM Bradley is a privately held, commercial real estate firm providing property management and advisory and consulting services.  After a successful  project and enjoyable experience, Ruston Paving was hired to perform major renovations...

Woodcliff Office Park – Victor, NY

The office complex parking lot at 370 Woodcliff Drive in Victor, New York was in need of some TLC.  Drainage isues needed to be addressed, granite curbs needed to be reset and the asphalt pavement had deteriorated over the years due to an unstable subgrade.  The original parking area had been constucted over roughly 20 feet of fill material.  After...

LDS Church – Frederick, MD

Our northern Virginia based crews recently repaved The Church of Jesus Christ of Latter-day Saints (LDS) in Frederick, Maryland.  The scope of the project involved some minor repairs to the lot, installation of pavement fabric and a hot mix asphalt overlay.  Pavement fabric was used on this particular project to help prevent reflective cracking, which occurs when...

YRC in Landover, MD

Ruston Paving was contracted by YRC to perform pavement improvements at its Landover, MD terminal.  YRC (created from the merger of Yellow Corporation and Roadway Corporation) is the leading transporter of industrial, commercial, and retail goods, specializing in solutions for businesses across North America.  This is the second project we have completed for YRC this...

Remington Arms – Ilion, NY

Our crews returned for another year to perform some pavement improvements at Remington Arms during the company’s annual summer shutdown.  This year’s repairs called for us to mill out or excavate deteriorated asphalt, fine grade the existing stone base of the replacement areas, and install lifts of asphalt binder and asphalt top. The 2011 improvements...

Ruston Paving to the Rescue

A sinkhole opened during heavy rains in the parking lot of the Big Kmart at Parkway Plaza on University Drive in Durham late Friday afternoon.  After heavy storms dropped almost 2 inches of rain on Durham in a little over an hour, the parking lot flooded and caused a 20′ wide by 20′ long by 16′...

Crossroads Plaza – Cary, NC

Shown here is Art Metcalf digging with the rubber tire excavator and loading the spoils into Ronnie Street’s Peterbilt dump truck. This was the second day of a four-day job completing asphalt repairs for Crossroads Plaza in Cary, NC. In 2006, we completed a large parking lot reconfiguration job at the plaza and they have had us...